|
Year 2010 - Accepted (3) and Working Papers(XX) - "Designing Meta-heuristics - A Plug and Play Approach," A. Lim, M. Jing, B. Rodrigues, Artificial Intelligence Review, accepted.
- "Load Balancing in Project Assignment," Z. Liang, S. Guo, Y. Li and A. Lim, Computers and Operations Research, accepted.
- "Crossdocking Distribution Network with Setup Cost and Time Window Constraint," H. Ma, Z. Miao, A. Lim, B. Rodrigues, OMEGA, accepted.
- "Approximation Algorithms for the Capacitated Traveling Salesman Problem with Pickup and Delivery on a Tree," A. Lim, F. Wang, Zhou Xu, ACM Transactions on Algorithms, revised and resubmitted.
- "Courier Services Procurement with Shipper Preferences," A. Lim, B. Rodrigues, and Z. Xu, Operations Research, revised and to be resubmitted.
- “Managing Grocery Perishables,” Y. Li and A. Lim, Productions and Operations Management, revised, to be resubmitted.
- "Molecular Search and Molecular Bank Algorithm for Resourc-Constrained Project Problem," A. Lim, H. Ma, B. Rodrigues, F. Xiao, submitted.
- "An Algorithm for the Freight Allocation Problem with All-Units Quantity-Based Discount," H. Qin, A. Lim, R. Shen, submitted.
- "Inspection Scheduling and Routing Problem in a Buying Office,” C. Che, B. Cheang, A. Lim, X. Zhou, S. Guo, J. Chow, D. Wong, submitted.
"New Concepts in Activity Floats in Resource Constrained Project Management,” A. Lim, H. Ma, B. Rodrigues, F. Xiao, Computers and Operations Research, revision. - "An Investigation of IDA* Algorithmsfor the Container Relocation Problem," W. Zhu, H. Zhang, S. Guo, A. Lim, submitted.
- "Molecular Search and Molecular Bank Algorithm for Resource Constrained Project Scheduling Problem", submitted.
- "The Six Elements to Bloc-Building Approaches for the Single Container Loading Problem," submitted.
- "PageRank Matches Perceptios of ORMS Professors on Journal Rankings," submitted.
- "Space Defragmentation for Packing Problems," submitted.
- "Application of the Tree data structure to the pickup and delivery traveling salesman problem," submitted.
- "Robust Network Design with Facility Disruptions," submitted.
- “An Improved Column Generation Approach for Multiple Container Loading Problem” to submitted.
- "A Transportation Service Procurement Problem with Shipping Volume Discount” to be submitted.
- "Exact Algorithm for Single.Vehicle Routing Problem with Toll by Weight Scheme” submitted.
- "Constrained Warehouse Order-Picking With Picker Capacity and Depot Time Windows, submitted.
- The Warehouse Order-Picking Problem with Blocked Items", to be submitted.
- Vehicle Routing Problem with Time Window and Accumulative Link Capacity Constraints: A One-Starge Tabu Search Approach", to be submitted.
- "Balanced Partitioning to Promote Effective Learning: Applications in an International School”, in preparation
- "Discretization and Decomposition for Irregular 2D Packing”, in preparation.
-
Year 2009 (4) - "Combined Pricing and Inventory Control for a Perishable Product with Two-Period Lifetime," Y. Li, A. Lim, B. Rodrigues, Manufacturing Service and Operations Management, Vol 11, No. 3, Summer 2009, 538-542.
"Distinguishing Citation Quality for Journal Impact Assessment," A. Lim, H. Ma, Q. Wen, Z. Xu, and B. Cheang, Communications of ACM, August 2009, vol 52, No 8, 111-116. "Searching Optimal Re-sequencing and Feature Assignment on an Automated Assembly Line," A. Lim and Z. Xu, Journal of the Operations Research Society, 60, 2009, 361-371. "Truck Dock Assignment Problem with Operational Time Constraint within Crossdocks," A. Lim, H. Ma, and Z. Miao, European Journal of Operatioal Research, 192 (2009) 105-115.
Year 2008 (5)
"Transportation Procurement with Seasonally-Varying Demand and Volume Guarantees," A. Lim, B. Rodrigues, Z. Xu, Operations Research,May-June 2008, 56, 758-771. "An Effective Local Search Method to solve the Flexible Demand Assignment Problem," F. Wang, A. Lim, IEEE Transactions on Automation Science and Engineering, Volume 5, Issue 2, 2008, 289-297. - "Enabling structual summaries for efficient update and workload adaption," Q. Chen, A. Lim, K. Ong, Data and Knowledge Engineering, volume 64, number 3, 558-579 (2008).
"Tariff Concession in Production Sourcing," Y. Guo, Y. Li, A. Lim, B. Rodrigues, European Journal of Operational Research, volume 187 (2) 543-555. "The Selection and Assignment Problem with Minimum Quantity Commitment," A. Lim, Z. Xu, F. Wang, Journal of Operational Research Society, 59, 692-702, May 2008.
Year 2007 (10)"Global Sourcing Using Local Content Tariff Rules," Y. Li, A. Lim, B. Rodrigues, IIE Transactions, Volume 39, Issue 5 May 2007, 425-437. (PDF) "A Two-Stage Heuristic with Ejection Pools and Generalized Ejection Chains for the Vehicle Routing Problem with Time windows," A. Lim and X. Zhang, Informs Journal on Computing, Volume 19, Number 3 (Summer 2007). (PDF) (Supplement) "A m-Parallel Crane Scheduling Problem With A Non-Crossing Constraint," A. Lim, B. Rodrigues, Z. Xu, Naval Research Logistics, Volume 54, Issue 2, Pages 115-235 (March 2007). (PDF) "Port Space Allocation in Two Dimensions with Time Constraints," Z. Fu, Y. Li, A. Lim, B. Rodrigues, Journal of the Operational Research Society, Volume 58, Number 6, June 2007, pp. 797-807(11). "A Stochastic beam search for the berth allocation problem," F. Wang, A. Lim, Decision Support Systems, 42(4) 2186-2196 (2007). (PDF) "Particle Swarm Optimization and Hill Climbing to Solve the Bandwidth Minimization Problem," A. Lim, Jing Lin, and Fei Xiao, Applied Intelligence, Volume 26, Number 3, June 2007, 175-182. "Minimizing The Makespan of Unrelated Parallel Machines," Y. Guo, A. Lim, B. Rodrigues and L. Yang, International Journal on Artificial Intelligence Tools, Vol. 16, No. 3 (2007) 399-415. "A Fast Algorithm for Bandwidth Minimization," A. Lim, B. Rodrigues, F. Xiao. International Journal on Artificial Intelligence Tools, Vol. 16, No. 3 (2007) 537-544. "A Local Search Using Solution Fragments for the 2-Machine Bicriteria Scheduling Problem," G. Huang, A. Lim, B. Rodrigues, Computational Optimization and Applications, volume 37, issue 2, pages 219-229. "Machine Scheduling Performance with Maintenance and Failure," A. Lim, B. Rodrigues, S. Yu, Mathematical and Computer Modelling, vol 45 (2007) 1067-1080.
Year 2006 (17)- "The Bottleneck Problem with Minimum Quantity Commitment," A. Lim and Z. Xu, Naval Research Logistics, Volume 53, Issue 1, 2006, 91-100. (PDF)
- "A Transportation Problem with Minimum Quantity Commitments," A. Lim, F. Wang, Z. Xu, Transportation Science, Vol 40, No. 1, Feb 2006, pp. 117-129. (PDF)
- "A Hybrid Genetic Algorithm for the Three-Index Assignment Problem," G. Huang and A. Lim, European Journal of Operational Research, 172 (2006) 249-257. (PDF)
- "Heuristics for matrix bandwidth reduction," A. Lim, B. Rodrigues, F. Xiao, European Journal of Operational Research, 174 (2006) 69-91. (PDF)
- "A Critical-Shaking Neighborhood Search for the Yard Allocation Problem," A. Lim and Z. Xu, European Journal of Operational Research, 174 (2006) 1247-1259. (PDF)
- "A Simulated Annealing with Hill Climbing Approach to solve the Traveling Tournament Problems," A. Lim, B. Rodrigues, X. Zhang, European Journal of Operational Research, 174 (2006), 1459-1478. (PDF)
- "Scheduling sports competitions at multiple venues - Revisited," A. Lim, B. Rodrigues, and X. Zhang, European Journal of Operational Research, 175 (2006), 171-186. (PDF)
- "The One-Commodity Pickup and Delivery Travelling Salesman Problem on a Path or a Tree," A. Lim, F. Wang, Z. Xu, Networks, Volume 48, Issue 1 (August 2006) 24-35. (PDF)
- "Indexing XML Documents for XPath Query Processing in External Memory," Q. Chen, A. Lim, K. Ong, J. Tang, Data and Knowledge Engineering, 59 (2006) 681-699. (PDF).
- "Indexing Graph-Structured XML Data for Efficient Structural Join Operation," Q. Chen, A. Lim, K. Ong, J. Tang, Data and Knowledge Engineering, 58 (2006) 159-179. (PDF)
- "Multi-Crossdocks with Inventory and Time Windows," P. Chen, Y. Guo, A. Lim, B. Rodrigues, Computers and Operations Research, Volume 33, Issue 1, January 2006, pages 43-63. (PDF)
- "Heuristics for A Bidding Problem," Y. Guo, A. Lim, B. Rodrigues, Y. Zhu, Computers and Operations Research, Volume 33, Issue 8, August 2006, pages 2179-2188. (PDF)
- "Ant Colony Optimization with Hill climbing to Solve the Bandwidth Minimization Problem," A. Lim, J. Lin, B. Rodrigues, F. Xiao, Applied Soft Computing, Volume 6, Issue 2, January 2006, Pages 180-188. (PDF)
- "Using A Lagrangian Heuristic For A Combinatorial Auction Problem," Y. Guo, A. Lim, B. Rodrigues, J. Tang, International Journal on Artificial Intelligence Tools, Vol. 15, No. 3 (2006) 481-489.
- "Carrier Assignment Models Transportation Procurement," Y. Guo, A. Lim, B. Rodrigues, Y. Zhu, Journal of Operational Research Society, 57, 1464-1471. (PDF)
- "Crane Scheduling with Non-Crossing Constraints," Y. Zhu and A. Lim, Journal of Operational Research Society, 57, 1472-1481 . (PDF)
- "Two Machine Flow Shop Problems with a Single Server," A. Lim, B. Rodrigues, C. Wang, Journal of Scheduling, Journal of Scheduling (2006) 9, 515-543.
Year 2005 (9)- "A Note on the Optimal EOQ for Announced Price Increases in Infinite Horizon," A. Lim and B. Rodrigues, Operations Research, Vol 53, No 4, 2005, 731-732.
- "k-Center problems with minimum coverage," A. Lim, B. Rodrigues, F. Wang, Z. Xu, Theoretical Computer Science (2005) Volume 332, Issues 1-3, February 2005, 1-17. (PDF)
- "Manpower Allocation with Time Windows and Job Teaming Constraints," Y. Li, A. Lim and B. Rodrigues, Naval Research Logistics, volume 52 (4), 2005, 302-311. (PDF)
- "Transshipment through Crossdocks with Inventory and Time Windows", A. Lim, Z. Miao, B. Rodrigues, Z. Xu, Naval Research Logistics, Volume 52 (8), 2005, 724-733.
- "Multi-depot Vehicle Routing Problem: two-stage and one stage approach", Andrew Lim and F. Wang, IEEE Transactions on Automation Science and Engineering, volume 2, No 4, October 2005, 397-402. (PDF )
- "Airport Gate Scheduling with Time Windows", Y. Zhu, A. Lim and B. Rodrigues, Artificial Intelligence Review, Volume 24, No 1, Sept 2005, 5-31. (PDF)
- "Tabu Search embedded Simulated Annealing for the Shortest Route Cut and Fill Problem," A. Lim, B. Rodrigues, J. Zhang, Journal of Operational Research Society, Vol 56, No 7, 2005, 816-825. (PDF)
- 3D Container Packing Heuristics", A. Lim, B. Rodrigues, Y. Yang, Applied Intelligence, Vol. 22, No. 2 (March-April 2005), 125-134.
- "The Over-Constrained Airport Gate Assignment Problem", A. Lim, B. Rodrigues, Y. Zhu, Computers and Operations Research (2005) Volume 32, Issue 7, July 2005, 1867-1880. (PDF)
Year 2004 (10)- "Meta-Heuristics with Local Search Techniques for Retail Shelf Space Optimization", A. Lim, B. Rodrigues, XW Zhang, Management Science, Vol 50, No 1 (2004), 117-131. (PDF)
- "Port Yard Optimization Problem", P. Chen, Z. Fu, A. Lim and B. Rodrigues, IEEE Transactions on Robotics and Automation (2004) Vol 1, Number 1, 26-37. (PDF)
- "Crane Scheduling with Spatial Constraints", A. Lim, B. Rodrigues, F. Xiao, Y. Zhu, Naval Research Logistics, Volume 51, Issue 3, April 2004, 386-406. (PDF)
- "A Hybrid Framework for Over-Constrained Generalized Resource Project Scheduling Problems", A. Lim, B. Rodrigues, R. Thangarajoo, F. Xiao, Artificial Intelligence Review (2004) June, Vol 22, Number 3, 211-243. (PDF)
- "New Heuristics for the Over-constrained Flight to Gate Assignments", H. Ding, A. Lim, B. Rodrigues, Y. Zhu, Journal of the Operational Research Society (2004) 55, 760-768. (PDF)
- "Manpower Allocation Problem with Time Windows", A. Lim, B. Rodrigues, Lei Song, Journal of the Operational Research Society (2004) 55, Number 11, 1178-1186. (PDF)
- "Crossdocking : JIT Scheduling with Time Windows," Y. Li, A. Lim, B. Rodrigues, Journal of the Operational Research Society (2004) 55, Number 12, 1342-1351. (PDF)
- "The Two Dimensional Packing Problem for Irregular Objects", P. Chen, Z. Fu, A. Lim and B. Rodrigues, International Journal on Artificial Intelligent Tools (2004) Volume 13, Number 3, September, 429-448.
- "Minimizing Total Flow Time in Single Machine Environment with Release Time: An Experimental Analysis", Y Guo, A. Lim, B. Rodrigues, S. Yu, Computers and Industrial Engineering (2004) November, Volume 47, issues 2-3, 123-140.
- "Machine scheduling problem under shared resource constraints: A Genetic Algorithm Approach", Y. Li, A. Lim and F. Wang, International Journal of Computer Applications in Technology, volume 19(2), 2004, 77-83.
Year 2003 (8)
- "A Metaheuristic for the pickup and delivery problem with time windows", H. Li and A. Lim International Journal on Artificial Intelligent Tools, Volume 12, No 2 (2003) 173-186. (PDF)
- "Sexual Selection For Genetic Algorithms", K. Goh, A. Lim and B. Rodrigues, AI Review, volume 19, number 2 (2003), 123-152. (PDF)
- "Local Search with Annealing-like Restarts to solve the VRPTW", H. Li and A. Lim, European Journal on Operational Research, volume 150, No 1 (2003) 115-127 (PDF)
- "Nurse Rostering Problems - A Bibliographic Survey", B. Cheang, H. Li, A. Lim, B. Rodrigues, European Journal of Operational Research, Volume 151 (2003) 447-460. (PDF)
- "Automated Campus-Wide Examination Timetabling at the National University of Singapore", A. Lim, Juay-Chin Ang, Wee-Kit Ho and Wee-Chong Oon, Practice Abstract, Interfaces, accepted.
- "On Automated Grading of Programming Assignments in an Academic Institution", B. Cheang, A. Kurnia, A. Lim, W. Oon, Computers and Education, 41 (2003) 121-131. (PDF)
- "A Multifaced Buildup Algorithm for Three Dimensional Packing", A. Lim, B. Rodrigues, Y. Wang, Omega Volume 31, Number 6 (2003) 471-481
|